JEB logo

Journal of Environmental Biology

pISSN: 0254-8704 ; eISSN: 2394-0379 ; CODEN: JEBIDP

About Journal
    Home
    Obituary: Dr. R. C. Dalela
    Editorial Board
    Reviewer Panel
    Publication Policies
    Guidelines for Editors
    Guidelines for Reviewers
    Abstracting and Indexing
    Subscription and Payments
    Contact Journal
    About Triveni Enterprises
 
Read Journal
    Current Issue
    Journal Archives
 
For Authors
    Guidelines for Authors
    Terms and Conditions
    Author Resources
    Fees and Payments
    Track Paper Status
 

Google Search the Journal web-site:


    Abstract - Issue Nov 2009, 30 (6)                                     Back


abstract_07

A study on the performance of a pilot scale A2/0-MBR system in

treating domestic wastewater

 

J. Rajesh Banu2, Do Khac Uan1, Ik-Jae Chung1, S. Kaliappan2 and Ick-Tae Yeom*1

1Department of Civil and Environmental Engineering, Sung Kyun Kwan University, 300,

Chunchun-dong, Jangan-gu, Suwon, 440-746, Korea

2Anna University, Tirunelveli - 627 007, India

(Received: February 02, 2008; Revised received: October 18, 2008; Accepted: November 15, 2008)

 

Abstract: Phosphorus and nitrogen are the important eutrophication nutrients. They were removed in the anaerobic/anoxic/oxic (A2/O) system through biologically. The use of pilot scale A2/O systems with immersed membranes in removing nutrients phosphorus and nitrogen were investigated over a period of 150 days. The A2/O membrane bio reactor (MBR) was operated at a flux of 17 LMH. The designed flux was increased stepwise over a period of one week. The reactor was operated with the mixed liquid suspended solids (MLSS) concentrations in the range of 7000-8000 mg l-1. The phosphorus removal was found to be in the range of 74-84%. The ammonification was completed in the aerobic zone and the ammonia concentration was almost nil. Nitrate concentration in the anoxic zone was found to be in the range of 0.3-1.6 mg l-1 indicating efficient denitrification. The nitrogen removal efficiency of the A2/O-MBR system was in the range of 68 to 75%. The chemical oxygen demand (COD) in the effluent was in the range of 8-5 mgl-1 indicating the efficiency of membrane. During the period of reactor operation transmembrane pressure (TMP) of the reactor increased slowly from 0 to 6 -cmHg over a period of 150 days.

?Key words: A2/O - MBR, Nutrient removal, TMP

???????? PDF of full length paper is available online

 

Copyright ? 2009 Triveni Enterprises. All rights reserved. No part of the Journal can be reproduced in any form without prior permission. Responsibility regarding the authenticity of the data, and the acceptability of the conclusions enforced or derived, rest completely with the author(s).